Failure and repair of cement mill high voltage motor
In the normal production operation of our Φ2.2m×6.5m cement mill high-voltage motor, we suddenly found a flash-like open flame in the end cap of the motor wreath, and then stopped the organization to carry out comprehensive inspection and repair, thus avoiding a major accident. The relevant situation will be introduced as follows.
1 main technical parameters of the motor
Model: JR158-8 rated speed: 735r/min
Standard number: JB564-64 rated rotor current: 439A
Rated power: 380kW rated rotor voltage: 522V
Rated voltage: 6000V connection: Y
Rated current: 46.4A Manufacturer: Shenyang Motor Factory
2 fault inspection and analysis
After the fault occurred, in order to be cautious, we first measured the DC resistance of the motor insulation and the three-phase winding, and no abnormalities were found. Then, the core inspection of the motor was found, and the bearing of the motor load end 2326 was worn, accompanied by a slight broom trace, and the cause of the flare was not detected. Then the motor bearing was changed, the groove was fixed, and the insulation treatment was performed. After installation, the test was carried out. When the motor was started, the same flare was found. Immediately stop the machine and perform a detailed inspection. It was found that there was a wire insulation protection layer with a small hole of rice size. The insulation layer was peeled off and found to have a bean-sized pit. The pit was flat copper. The line is blown. The flare is released after the insulation is burned from the inside out during the melting of the flat copper wire.
After careful analysis, it is believed that the main reason for this failure is that the stator winding flat copper wire has a joint here (or there is impurity), and the joint contact is not good, and the heat is generated after the solder is melted.
3 troubleshooting
The fault location is outside the end hoop 15cm outside the stator slot, and the working space available for operation is very narrow and can hardly be repaired. Moreover, there is no spare motor in the factory, and the production task is not allowed to stop production for a long time. It is sent to the mainland manufacturers for repair and the time is not allowed. In this case, we open the motor end cover again. After repeated and careful honing research, it is determined that the flat copper wire that has been blown is taken out from the wire loop, bypassed from the end hoop, and the middle part is covered with a flat piece of the same specification. The copper wire method was fixed and succeeded. The specific repair steps are as follows.
(1) Using the special-purpose cutting knife to engrave the phenolic mica composite insulation protective layer on both ends of the burnt winding, find out the six blown flat copper wires, and then blow the residue with a blower (the flat copper wire in the wire slot is up and down) Two layers, 28 on each layer, and six on the bottom layer). A 1032 melamine alkyd paint was sprayed around the winding-damaged wire with a syringe, and a natural mica plate was inserted between the wires of the damaged winding, and 6101 epoxy resin was poured.
(2) Find the corresponding wire ends that have been blown, apply the surface after the tin, and then use the flat copper wire of the same specification 15~20cm. After heat treatment, each end is lapped about 3cm, bundled with steel wire and coated with tin. Epoxy resin. A total of two layers of glass fiber braided tubes are placed in each line. Each layer of epoxy resin is coated with a layer of glass fiber braided tube, and the six wires are bundled together with a yellow wax strip. Finally, a layer is coated on it. Approximately 4 mm thick epoxy resin.
(3) After the wiring and insulation treatment are completed, the test insulation and DC resistance are in line with the technical requirements. Then start the test three-phase current, three-phase current balance, sound, temperature is normal, the flare disappears.
4 repair costs and operation
The direct repair cost of this fault is about 100 yuan, the repair time is 20h, and the boot test is normal. After more than one year of production and operation, no abnormal situation has been found, which ensures the normal production.